D8.2 Parametric Cost Model
D8.2 Parametric Cost Model Download Deliverable D8.2 This document constitutes Deliverable 8.2 of the LiftWEC project and consists of the description of the parametric cost model that will be used in this project to calculate the levelized cost of energy of the LiftWEC concept. A literature review has been performed to compile the different cost …