June 2021

LiftWEC_Logo

Work Package 09 Update – Project Month 15

Work Package 09 Update – Project Month 15 Work on the environmental and social acceptance of LiftWEC has continued to seek and assess relevant environmental and social influences on LiftWEC design criteria as outlined in Deliverable 9.1: “Identification of potential technology stressors and environmental receptors of the LiftWEC technology”. This report identifies potential wave energy …

Work Package 09 Update – Project Month 15 Read More »

LiftWEC_Logo

Work Package 08 Update – Project Month 15

Work Package 08 Update – Project Month 15 The latest work on the Levelised Cost of Energy (LCoE) has focused on identifying and facilitating discussions on the most significant potential cost saving measures available to the LiftWEC technology. This analysis will continue throughout the LiftWEC development pathway. To assess the economic performance of the different …

Work Package 08 Update – Project Month 15 Read More »

LiftWEC_Logo

Work Package 06 Update – Project Month 15

Work Package 06 Update – Project Month 15 Recent work on structural design includes the Ultimate Limit State (ULS) analysis of LiftWEC subject to operational and non-operational loads. Results have been presented in both Deliverable D6.1 “Extreme Event LiftWEC ULS Assessment” and Deliverable D6.2 “Transportation and Maintenance LiftWEC ULS Assessment”. One notable highlight is the …

Work Package 06 Update – Project Month 15 Read More »

LiftWEC_Logo

Work Package 03 Update – Project Month 15

Work Package 03 Update – Project Month 15 Recent work on hydrodynamic modelling has focused on assessing the computational capabilities of the numerical toolsets developed during the first phase of the project, followed by preliminary validation of the high-fidelity numerical methods. More detail on these works is presented in Deliverable D3.2 “Preliminary Assessment of Computational …

Work Package 03 Update – Project Month 15 Read More »