January 2021

D7.3 Assessment of Preliminary Configurations – Operations & Maintenance

D7.3 Assessment of Preliminary Configurations (O&M) Download Deliverable D7.3 This deliverable describes the results of the assessment of the preliminary configuration designs of the LiftWEC concept. It details the ‘Scenario Test Cases’ that were run on certain preliminary configuration designs. Due to delays in development of the operations and maintenance software, as well as the …

D7.3 Assessment of Preliminary Configurations – Operations & Maintenance Read More »

D6.1 Extreme Event LiftWEC ULS Assessment

D6.1 Extreme Event LiftWEC ULS Assessment Download Deliverable D6.1 This document constitutes Deliverable ‘D6.1 Extreme Event LiftWEC ULS Assessment” of the LiftWEC project. LiftWEC is a collaborative research project funded by the European Union’s Horizon 2020 Research and Innovation Programme under Grant Agreement No 851885. It is the intention of the project consortium that the …

D6.1 Extreme Event LiftWEC ULS Assessment Read More »

D3.2 Preliminary Assessment of Computational Capability Report

D3.2 Preliminary assessment of computational capability report Download Deliverable D3.2 This deliverable shows a preliminary assessment of the performance of the employed numerical tools for the purpose of hydrodynamic modelling within the LiftWEC project. Two modelling approaches and their respective implementation are presented and their theoretical background is discussed. This background is required in order …

D3.2 Preliminary Assessment of Computational Capability Report Read More »

D9.1 Identification of Potential Technology Stressors & Environmental Receptors

D9.1 Identification of Potential Technology Stressors and Environmental Receptors Download Deliverable D9.1 LiftWEC is a collaborative research project funded by the European Union’s Horizon 2020 Research and Innovation Programme under Grant Agreement No 851885. The LiftWEC project aims at identifying promising configurations of a Wave Energy Converter operating through the use of one or more …

D9.1 Identification of Potential Technology Stressors & Environmental Receptors Read More »

D7.2 Development of Models & Operational Framework – Operations & Maintenance

D7.2 Development of Models & Operational Framework (O&M) Download Deliverable D7.2 This deliverable will outline the models and design frameworks, which will be developed to assess the LIFTWEC concepts. A description is given for the installation strategy design framework developed to review the concept designs and identify viable installation strategies. Similarly, a description is given …

D7.2 Development of Models & Operational Framework – Operations & Maintenance Read More »