D7.2 Development of Models & Operational Framework (O&M)

This deliverable will outline the models and design frameworks, which will be developed to assess the LIFTWEC concepts. A description is given for the installation strategy design framework developed to review the concept designs and identify viable installation strategies. Similarly, a description is given for the decommissioning strategy design framework. The recently developed O&M Expert tool, created to model O&M costs is also discussed.